Monday, April 29, 2013

Monday April 29, Steve drove me over to Add lumber in his pick up truck and I bought a 4x8 sheet of ¾ treated plywood. I painted both sides of the plywood and cut it to fit the rear platform of the speeder. I put the left over piece in the front platform.

Friday, April 5, 2013

I went up to the museum April 4,5 I removed the old brake shoes and blocks. I mounted the new brakes shoes. I need to work on the adjustment so that the two sides come in contact at the same time. I drilled holes and bolted the new cross members in place. I put a manual choke on the carburetor.